Files | Description |
---|
| From weeks 1-4 of a rapid onset emergency or before the development of a strategic plan, the basic Phase 1 - 3W can be used to collect key operational information to share to the partners. |
| Once the WASH SOF/HRP indicators are defined, the more extensive Phase 2 - 4W should be developed (using the Excel sheet that lists interventions, units and indicators). This is usually the format used in most protracted contexts. |
| This Response Monitoring Briefing Sheet aims to assist in designing a 4W tool W-matrix to capture what has been delivered activities delivered by WASH partner and calculate overall indicators for a specific emergency. |
| This is a mapping of most analyses that can be drawn from the 4Ws.a W-matrix |
| This is a useful document highlighting the limitations of the 4Ws W-matrix including some potential solutions to better capture key WASH response data. |