Expand
titleKey guidance and tools

2016 GWC WASH 4W Guidance.docx

Phase 1 - Basic 3W.zip

Phase 2 - Basic 4W.zip


Expand
titleField examples

0. Generic.zip

1. Location Type.zip

2. Indicator Tracking.zip

3. Sum of Max.zip



Expand
titleOther tools


...

Prepare the activity reporting tool (5W matrix or similar)

...

titleHow will you do it?

...

alignjustify

One of the GWC Minimum Requirements for WASH coordination is the establishment of an activity reporting tool such as 5W matrix. A 5W (who, what, where, when and for whom) is a tool to collect information on emergency response activities by partners. Depending on the emergency phase, more basic variants of the 5W can be used: 3W (who, what, where) and 4W (who, what, where, when). A basic activity reporting tool such as 3W must be set up in the early stage of the response, and modified and enriched later once the WASH operational response plan’s monitoring plan has been finalized. GWC has developed 3/4/5W templates, that can to be customized for each context. See more about adapting and rolling out the 5W in the Roll out activity reporting tool in the Monitoring section

Other tools exist, such as Activity Info (https://www.activityinfo.org/), used for instance by the Clusters in DRC

...

Expand
titleKey guidance and tools

2016 GWC WASH 4W Guidance.docx

Phase 1 - Basic 3W.zip

Phase 2 - Basic 4W.zip

...

titleField examples

0. Generic.zip

1. Location Type.zip

2. Indicator Tracking.zip

3. Sum of Max.zip

...