Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Expand
titleKey guidance and tools
  • 2016 GWC WASH 4W Guidance.docx
  • Phase 1 - Basic 3W.zip
  • Phase 2 - Basic 4W.zip

    See Activity reporting tool (W-matrix) section 



    Expand
    titleField examples
    5W example packages.zip

    See Activity reporting tool (W-matrix) section


    Expand
    titleOther tools

    See Activity reporting tool (W-matrix) section

    Roll out the partners' activity reporting

    ...

    tool

    The core response monitoring mechanism are the activity reporting tools. Although some other system exist, the main Activity reporting tool is the 5W matrix. A W-matrix. Refer to the Activity reporting tool (W-matrix) section in the Information Management chapter. With a well-structured 5W matrix W-matrix, the WASH coordination unit will be able to:

    • Track progress towards HRP objectives and targets
    • Highlight disparities to inform adjustments in the response – these might be geographic, sub-sectoral, by type of beneficiary or response, inter-cluster, etc. 
    • Highlight service-level indicators for the activities, measured against the minimum standard benchmarks
    • Facilitate transparency and accountability to WASH partners, donors, public and affected population

     A A core function of the IMO is to ensure that such operationally relevant data is available in a timely, digestible manner to support operational decision making. A well-constructed activity tracking system will also minimise the time required to fulfil fulfill upward reporting obligations, to maximise maximize the time available for strengthening each part of the IM system, to and enable more specific gap analyses.

    5W W-matrix must be set up in the early stage of the response, and modified later once the strategy's monitoring plan will be is finalized. It can be designed using GWC template, but needs to be customized for each crisis based on the monitoring plan indicators and queries done by WCC to the IMO. 5W W-matrix can produce satisfactory outputs only if:

    • It has been well designed 
    • partners are trained and supported to fill it with their project data in a timely manner

    5W W-matrix do have limitations, and should be complemented and triangulated with other monitoring system, such as Technical Quality monitoring, or Feedback and Complaints Mechanism 

    ...